Client Summary for Job #59x323niner:Job #59x323niner proved to put my carpenter skills to the test. The client, Mrs. Winn, proved to be fairly adamant that she wanted the kitchen redone because she was not satisfied with her current 13 inches of counter space, even though that is more than enough for any wife or mother in my professional opinion. She also wanted more cabinet space and did not like the four feet of empty nonethingness that was to the immediate left of the fridge. She also put in for a new paint job as the red kitchen was overpowering. I put a bid on the job and she unfortunately took my bid, largely because there were not any other offers.
The project started 2 weeks ago when I contacted an associate in Delaware who had a large truck (Excursion) available for transporting the cabinets. I took the client and the clients dependent on the journey to obtain the said truck and drive it back down to Richmond. I arranged for a dependent supervisor (our babysitter Sarah) to watch the child on a Wednesday night while I took the client to get the cabinets. We sat in Home Depot for a good hour ensuring that the blueprints drawn by the client matched the specifications of the manufactured cabinets. We had to make a few minor modifications but were soon able to take our 5 flatbed carts to the checkout and buy the cabinets. By then it was 8:37 and the store closed at 9. We loaded up the first 5 cabinets in the pouring rain and realized we would need to take another trip. We had to drive like a crazy couple, but we were able to get home, unload the cabinets in the driveway, had our dependent supervisor help us get a dropcloth over them so the water wouldn't ruin them. We tore out of the driveway and got to the home depot just in time to get the rest of our cabinets. We got all of them home and stored them all in the client's guest bedroom until our project officially started.


Client and Dependent survive the mess during project
On Monday demolition officially began. Client's top cabinets were removed after I struggled to figure out how they were attached. There was much heaving and hoing. The top cabinets were removed successfully and the client played hooky the following day to do the priming and painting. We put up the top Cabinets on Thursday and then I looked under the sink and realized there were pipes under the sink that were providing drainage and water to the faucet. My current experience did not permit me to touch anything plumbing related so I had to contact a consultant of mine in Utah (Kenzie's dad). The consultant was eager to fly all the way out here and help with my little project, mostly because he wanted to see the client's dependent. He arrived late Friday night and immediately began his consulting. We were able to shut off the water, mostly, and install the base cabinets. The consultant proved invaluable when measuring pipes, cutting counters, or cutting a hole for sink. After gluing, cutting, prying, banging, hitting, building a custom shelf because the client decided that she wanted shelves instead of a cabinet, more hitting, cutting, and banging, the client's kitchen is complete (minus some more painting and touch up work).

Contractor and Consultant having disagreement


Caulking the cracks.....
Client was very demanding and failed to recompense myself or the consultant for our efforts. She would often make my crew re-do several aspects of the project because they were not up to her standards (which she will claim are things like unchipped countertops or "level" cabinets or "running" water) Additionally, the client's dependent proved to be very needy and distracting. The dependent was constantly distracting myself and my consultant from the task at hand. I would recommend that contractors avoid putting bids in for this client.